Name :

Mahindra Electric

Date of Signing :

   December-2018

Synopsis

Under the MoU: 1. Interactions with engineers of Mahindra Electric 2. Successfully charged the EV at the centre after rectifying some issues in the vehicle 3. Procuring another Electric vehicle for tear down and study purpose for the students wherein Mahindra Engineers will conduct the tear down sessions.

Signing Authority :